The energy factor you quoted is missing about a third of itself

A published energy factor usually prices combustion and nothing else. The rest — getting the fuel to you — is published separately, and adding it moves UK grid electricity by 41% and wood pellets by 314%.

4 min read · last checked

UK grid electricity is 0.131 kg CO₂e per kWh. That figure is published, correct, and about 71% of the answer.

What it prices is generation. What it does not price is getting the fuel to the power station — extraction, processing, shipping — or the electricity to you through the wires. Those are published too, as separate rows, and a great many carbon footprints quietly omit them.

kg CO₂e/kWhTermWhat it covers
0.13096GenerationBurning the fuel. The number everyone quotes.
0.04041Well-to-tankExtracting, refining and delivering that fuel.
0.01299Transmission & distributionLosses in the wires between there and you.
0.18436All of it41% above the headline.

UK grid, DESNZ 2026. Three published rows; most reports use the first.

Under ISO 14067 there are no scopes. A product caused the extraction as surely as it caused the combustion, so both belong in its inventory — and the well-to-tank row exists precisely so you can add it.

Where it stops being a correction and becomes the answer

For mains gas the upstream term is about 17% on top. For grid electricity, 41%. For wood pellets it is larger than the thing it is added to:

kg CO₂e/kWhCarrierCombustionUpstream
0.0119Wood pellets — burning0.01193—
0.0374Wood pellets — upstream—0.03744
0.0494Wood pellets — all inupstream is 3.1× combustion

Pellets are dried and densified before they ship, and drying is usually the largest term in that.

Quote the combustion figure alone and pellets look like a near-zero fuel. Counted properly they are still far below any fossil option — this is not an argument against biomass — but they are four times what the headline implies, and a business case built on the headline will not survive being checked.

Biogas is the sharpest version: combustion 0.00022, production 0.01851. The burner figure alone makes it look 84 times better than it is.

Why the two halves are kept apart rather than summed for you

It would be easy to publish one number per carrier with everything folded in. This site deliberately does not, and the DESNZ library page keeps them as separate rows because that is how the source publishes them.

The reason is auditability. A reader who knows gas is 0.18231 should be able to find 0.18231, see the 0.03021 upstream figure named beside it, and understand how the total was reached. Present 0.21252 with no working and you have put a number in front of them that does not appear anywhere in the government document they are about to check it against — which costs you the argument even though your figure is the better one.

The practical test

When you are handed an energy factor, ask which of the three terms it contains. If the answer is “it’s the DESNZ number”, it is generation only and you are missing roughly a third. If someone quotes you a renewable tariff at zero, that is a market-based claim about contracts rather than electrons — which is a separate trap.

Check it yourself

Every figure above is on this site with its source, geography, method and licence.

Use this

These are the mistakes the assessment engine is built to avoid making. To watch it not make them on a product of your own, run a bill of materials through the free carbon calculator — no sign-up, and it runs in your browser. For the whole picture, including the process and its scrap, model the whole route in the prototype, or see what TrueGauge does for a manufacturer.

Early access

Request early access.

Both products are pre-launch. We're working with an early group of manufacturers, architects, builders and sustainability teams to shape what gets built first — tell us which platform is relevant to you.

  • Shape the roadmap

    Tell us which decisions you need supported, and what the data has to do to be usable.

  • First access

    Be first in line as each platform opens to early users.

  • A direct line to the team

    Early conversations happen with the people building it, not a sales funnel.

Register interest

Which platform? *

This registers interest in early access — both platforms are pre-launch, so this isn't a product signup or a purchase.