Skip to content
PunarGen

Sand casting

Melting is most of it, and the yield is the hidden term: runners, risers and gates are commonly half the metal poured. They are remelted rather than lost, but remelting them costs the melting energy again, which is why yield improvement beats furnace efficiency.

What it costs

Electricity1.5–6 kWh/kg

Per kilogram PROCESSED, not per kilogram shipped — an operation early in a route also processes everything the later steps will throw away.

Scrap30–60%

Normally recoverable as regrind in house. That reduces what must be bought; it does not reduce what the machines ran, and it never makes the loss free.

Material bought per kg shipped1.43–2.50 kg

1/(1−scrap), not 1+scrap. The difference is small at low scrap and decisive at high: at 70% the right answer is 3.33 kg and the tempting one says 1.70.

Applied to

steel · aluminium · cast_iron · brass · construction_metals

Where the numbers come from

Screening band from published process-engineering literature and industry benchmarking for this operation. Modelled, not a source-read figure — replace it with your own metered consumption.

These bands are deliberately wide. A narrow band implies a precision screening data does not have, and a plant that meters itself and lands outside a narrow band will rightly stop believing the rest. Replace it with your own reading.

Use this

These are screening bands for sand casting in general, not a reading from your line. To put a number on one of your own products, run its bill of materials through the free carbon calculator — no sign-up, and it runs in your browser. For the whole picture, including the process and its scrap, model the whole route in the prototype, or see what TrueGauge does for a manufacturer.

Early access

Request early access.

Both products are pre-launch. We're working with an early group of manufacturers, architects, builders and sustainability teams to shape what gets built first — tell us which platform is relevant to you.

  • Shape the roadmap

    Tell us which decisions you need supported, and what the data has to do to be usable.

  • First access

    Be first in line as each platform opens to early users.

  • A direct line to the team

    Early conversations happen with the people building it, not a sales funnel.

Register interest

Which platform? *

This registers interest in early access — both platforms are pre-launch, so this isn't a product signup or a purchase.