Foam board lamination (XPS, PIR)
THE BLOWING AGENT USUALLY MATTERS MORE THAN THE LINE. The process electricity here is modest, but the agent that makes the foam can carry a global warming potential in the hundreds or thousands, and a few percent by mass of something with a GWP of 1400 outweighs the polymer it is blowing. The industry has largely moved to HFOs and CO2 with GWP in the single digits, so which agent a given board uses changes its footprint by more than any process improvement — and it is a question about the product, not the plant. This library does not price blowing agents; ask which one is used and get its GWP.
What it costs
Per kilogram PROCESSED, not per kilogram shipped — an operation early in a route also processes everything the later steps will throw away.
Not normally recoverable in house, so the loss leaves as waste carrying its full upstream footprint.
1/(1−scrap), not 1+scrap. The difference is small at low scrap and decisive at high: at 70% the right answer is 3.33 kg and the tempting one says 1.70.
Applied to
xps · pir · ps
Where the numbers come from
Screening band from published polymer-processing benchmarking. Modelled, not a source-read figure — replace it with your own metered consumption.
These bands are deliberately wide. A narrow band implies a precision screening data does not have, and a plant that meters itself and lands outside a narrow band will rightly stop believing the rest. Replace it with your own reading.
Other operations on the same materials
Use this
These are screening bands for foam board lamination (xps, pir) in general, not a reading from your line. To put a number on one of your own products, run its bill of materials through the free carbon calculator — no sign-up, and it runs in your browser. For the whole picture, including the process and its scrap, model the whole route in the prototype, or see what TrueGauge does for a manufacturer.
Early access
Request early access.
Both products are pre-launch. We're working with an early group of manufacturers, architects, builders and sustainability teams to shape what gets built first — tell us which platform is relevant to you.
Shape the roadmap
Tell us which decisions you need supported, and what the data has to do to be usable.
First access
Be first in line as each platform opens to early users.
A direct line to the team
Early conversations happen with the people building it, not a sales funnel.