Independent · Specifier-paid · No manufacturer funding
Decide the carbon at Stage 2, when it is still cheap to change.
Roughly all of a building's embodied carbon is decided at concept design, and almost none of the product evidence exists yet. Databases answer “what is this product's GWP?”, which is a Stage 4 question. We answer the Stage 2 one: what range is this design in, what share of it do we actually cover, which choices has regulation already closed, and which unknown is worth resolving first.
Built to say what it does not know
Concept-stage ranges, not a false number
Paste a Stage 2 area schedule and get a range from the real EPD distribution of each material class — with the share of the building it actually covers stated first, and every uncounted line saying what would bring it in.
Gates before scores
On a higher-risk building, materials that cannot meet Regulation 7(2) are removed before anything is compared. No weighting reaches across a regulatory gate, so they are not ranked low — they are out, with the rule and the citation.
The trade stated, not settled
Where one material beats another on every axis, that ordering is real and we say so. Where each beats the other on something, no ordering exists that is not a preference — so the conflict is the finding, not a composite score.
The evidence clock
An EPD is valid five years from issue and nobody sends a reminder. We judge every declaration against your completion date, not today, and name the ones that expire before anyone audits the building.
Coverage reported beside the score
A score computed from absent evidence is still a score. Every axis says how many materials carry what it claims to assess — because a count tells you what to go and get, and an adjusted number does not.
Carbon-adjusted cost and CBAM
Future cost, not list price: price + CBAM exposure + the carbon cost of inbound transport, per supplier. Commercial figures are assumed demonstration values and labelled as such throughout.
Leakage detection
Design intent vs what procurement actually bought, with the carbon, cost and compliance drift quantified per substitution.
Shared impact engine
Impact arithmetic shared with TrueGauge: unit-gated quantity × factor, completeness always stated, hotspot-ranked contributions.
What this is — and is not
A decision-support platform on a curated demonstration dataset. Risk scores are compiled from public EPDs, classification reports and the REACH candidate list; prices, lead times and supplier data are assumed demonstration values pending real supplier price discovery, and are labelled wherever they appear. Concept ranges come from published EPD distributions per material class and are never a figure for a product. Euroclass figures used at concept stage are class typicals, not classifications.
It produces indicative, comparative intelligence for human judgment. It does not certify compliance, and it is not a substitute for a fire engineer, a quantity surveyor or regulatory sign-off.