Skip to content
PunarGen

Kiln firing (ceramic, lime)

The kiln's own thermal mass and wall losses frequently exceed the duty on the ware. Recuperation is the dominant lever, not burner tuning.

What it costs

Electricity0.8–4 kWh/kg

Per kilogram PROCESSED, not per kilogram shipped — an operation early in a route also processes everything the later steps will throw away.

Scrap2–10%

Not normally recoverable in house, so the loss leaves as waste carrying its full upstream footprint.

Material bought per kg shipped1.02–1.11 kg

1/(1−scrap), not 1+scrap. The difference is small at low scrap and decisive at high: at 70% the right answer is 3.33 kg and the tempting one says 1.70.

Efficiency, fuel-fired30–60%

Of the fuel burned, the share that reaches the ware. The rest goes up the flue, which is why comparing a gas factor with a grid factor per kWh of FUEL answers the wrong question.

Efficiency, electric92–99%

Nearly everything reaches the ware because there is no flue — though the grid that generated it had losses of its own, upstream and counted separately.

Direct process CO₂0.44 kg CO₂ per kg of CaCO₃ decomposed

Calcination of limestone (CaCO₃ → CaO + CO₂). This comes off the mineral, not the flame: no change of fuel removes it, and a renewable tariff does not touch it.

Applied to

clay · glass · cement_raw · steel

Where the numbers come from

Computed from sensible heat plus reaction enthalpy where one applies.

These bands are deliberately wide. A narrow band implies a precision screening data does not have, and a plant that meters itself and lands outside a narrow band will rightly stop believing the rest. Replace it with your own reading.

Use this

These are screening bands for kiln firing (ceramic, lime) in general, not a reading from your line. To put a number on one of your own products, run its bill of materials through the free carbon calculator — no sign-up, and it runs in your browser. For the whole picture, including the process and its scrap, model the whole route in the prototype, or see what TrueGauge does for a manufacturer.

Early access

Request early access.

Both products are pre-launch. We're working with an early group of manufacturers, architects, builders and sustainability teams to shape what gets built first — tell us which platform is relevant to you.

  • Shape the roadmap

    Tell us which decisions you need supported, and what the data has to do to be usable.

  • First access

    Be first in line as each platform opens to early users.

  • A direct line to the team

    Early conversations happen with the people building it, not a sales funnel.

Register interest

Which platform? *

This registers interest in early access — both platforms are pre-launch, so this isn't a product signup or a purchase.