CarbonSpec / Reclaimed steel
Will the reclaimed stock serve the frame?
Not a search. A reclaimed member is a length as well as a section, so the question is never “is there a 305×165 UB in stock” but whether the pieces can be cut to the lengths you need without wasting most of them. This assigns members to pieces, reports the offcut, and says why each unserved member could not be placed.
A piece whose grade is not established is never matched, however well the section and length fit. That is the case the testing route exists to settle, and it is set out below the matching — because the constraint on steel reuse is almost never whether the sections fit.
Reclaimed stock
id, section, length in mm, grade — leave the grade blank where it has not been established
Members the design needs
id, section, length in mm, grade, count
36% of the demand length served from stock
36% of the demand length is served from stock, leaving 2.5 m of offcut — 12% of the stock length drawn on. This is one matching that works, not the best one that exists: the assignment is first-fit decreasing, and finding the optimum is a different and much harder problem. 2 member rows could not be served and each says why.
How each piece is cut
| Piece | Section | Members | Used | Offcut |
|---|---|---|---|---|
| P2 | 305x165x40 UB | 1 | 7.0 m | 2.0 m |
| P1 | 305x165x40 UB | 2 | 11.5 m | 0.5 m |
What the stock cannot serve, and why
B2 — 2 × 305x165x40 UB at 4.5 m
Long enough pieces exist but are already committed to other members in this matching. A different assignment might place this one; see the note on the heuristic.
B3 — 4 × 203x133x25 UB at 6.0 m
No piece in the stock list carries this section. A different section may be structurally acceptable, but substituting one is an engineer's decision against a check, not a match.
What makes a reclaimed section usable
Reusing a reclaimed section takes 7 steps, and 4 of them belong to somebody the design team does not employ. That is the real constraint on steel reuse — not whether the sections fit, which this product can check in a minute, but whether the audit happened before the building came down and whether anybody commissioned the testing. The first step is the one with the shortest window and no way back.
1. Pre-demolition audit
Demolition contractorWhat is in the building, where, in what condition, and whether it can be removed intact rather than cut up.
Produces: An inventory of sections, lengths, locations and condition.
If skipped: The decision is made at demolition, under programme pressure, and the default is the skip. Nothing downstream can recover a member that has already been sheared.
2. Provenance and original documentation
Structural engineerWhat the steel was specified as when the building was built, and under which standard.
Produces: Original drawings, specifications or mill certificates where they survive.
If skipped: Testing has to establish everything from scratch rather than confirm a hypothesis, which is a larger and more expensive programme — and for older stock the original standard may not map onto a current grade at all.
3. Sampling and mechanical testing
Testing houseYield and tensile strength, elongation, and where required impact toughness, on material actually taken from the stock.
Produces: Test reports traceable to identified pieces.
If skipped: Grade is unproven, and the matcher in this product will not match it. That is the correct outcome: a section whose strength is assumed is a section whose design check means nothing.
4. Chemical analysis and weldability
Testing houseComposition, and from it carbon equivalent — which decides whether the member can be welded and under what preheat.
Produces: Chemical analysis reports and a weldability assessment.
If skipped: Connections become the unknown rather than the member. A section that cannot be welded as detailed is not reusable in that detail however sound the steel is.
5. Condition and geometry assessment
Structural engineerSection loss, distortion, notches, previous holes and any fatigue history that rules the piece out of a cyclically loaded application.
Produces: A condition record per piece, and a reduced section where relevant.
If skipped: The design check is run on a nominal section that the piece no longer is. Previous bolt holes in particular are easy to miss and change the member's capacity where they fall.
6. Declaration and CE/UKCA route
Steelwork contractorThat the reclaimed material can be placed on the market and incorporated under the execution standard the project is built to.
Produces: A declaration of performance and factory production control records.
If skipped: The steelwork contractor cannot take the material into their quality system, so it does not reach the frame whatever the tests said.
7. Design check against the established properties
Structural engineerThat each member works in its new position, using the grade and section proven above rather than the one it was specified as.
Produces: Design calculations referencing the test evidence per piece.
If skipped: Everything above was gathered and not used. This is the step that converts evidence into a structure, and it is the one that carries the engineer's liability.
No sampling rate, acceptance criterion or test frequency is reproduced here, and no emission factor for reclaimed steel. Those live in BS EN 1090, the product standards and the published reuse guidance; a reclaimed member’s A1-A3 depends on what was done to it, and the saving belongs to whoever commissioned that work.