CarbonSpec / Get a project in
Get a project in
At concept stage a project arrives in three shapes: a paragraph of brief, a bill of quantities pasted out of a spreadsheet, and a specification somebody else wrote. Each needs different handling, and none of them needs a model.
Paste the project description. It will pull out the floor area and any material with a quantity attached, and list what it cannot — nothing is assumed from floor area.
Floor area read as 8,200 m². 2 lines carry a quantity and can be assessed now. Nothing is assumed from floor area.
Schedule, ready to assess
2 lines read. Paste this into the assessment, or into the option comparison.
frame is of CLT with a concrete core,1240,m3 the facade is of brick-slip rainscreen on mineral wool with aluminium curtain walling to the ground floor,3100,m2
What it will not do with a brief
It will not estimate a figure from floor area. Doing so means multiplying your area by a published material intensity for every element nobody mentioned — an average over other people’s buildings, producing a confident number for a building nobody has designed.
That number then goes in the bid, because it arrives early, it looks like an assessment, and nothing on the screen distinguishes the two lines you wrote from the fourteen the tool supplied. So the materials your brief names without a quantity are listed as things to go and find, which is the shorter and more useful list.